Blog

TST Gets Energy-Saving Insulation Upgrades Underway at NSA Monterey

MONTEREY, CALIFORNIA – Working in conjunction with Utility Systems Solutions, Inc. (US2), TST’s confined space entry team arrived at NSA Monterey to begin measuring steam piping within 17 manholes for custom-made Removable Insulation Covers (RIC).  Over a period of four days, our team safely accessed the manholes and measured all bare fittings and pipe that are currently a source of energy loss. TST found nearly 300 bare fittings and 115 LF of pipe that will be insulated with custom-made RICs.  While on site, TST also installed 78 RICs in the boiler house on valves that were identified and measured during a previous visit to the Naval Postgraduate School. TST will return to NSA Monterey in late August or early September to complete the 2nd and final phase of work.  

TST has enhanced its competitiveness in the Federal marketplace by maintaining a strategic alliance with US2, Inc. for over a decade. Our alliance with US2 allows us to provide energy-saving insulation solutions to federal agencies while fulfilling their small-business participation procurement goals. US2, Inc. is a SBA certified 8(a) small-disadvantaged business (SDB) as well as a VA-verified Service-Disabled Veteran-Owned Small Business (SDVOSB) and Veteran-Owned Small Business (VOSB). Together we are able to offer the Federal marketplace the best combination of classification, performance, pricing, scheduling and competitiveness for state-of-the-art insulation products and turnkey contracting services.

Related Posts

Enter your keyword