VISN 5 – Insulation Upgrades
In conjunction with Steam Management, Inc. (Boston, MA), TST successfully completed an energy-improvement insulation project at three (3) VA Medical Centers located in Clarksburg, WV, Baltimore, MD and Perry Point, MD. TST measured, designed, fabricated and installed Removable Insulation Covers (RIC) on steam pipe fittings and equipment which will reduce heat losses and save energy throughout each healthcare facility for years to come. Having removable, reusable insulation will save the facility money over the years as the insulation can be removed and reinstalled when maintenance or repairs are necessary on the valves and strainers. In conjunction with the installation of RICs, TST also installed ASJ fiberglass pipe covering on various sections of steam piping throughout many of the same buildings and tunnels at the facility.