
Project Info
- Construction Date: May 2017
- Location: Washington, D.C.
- Category: Federal
Project Details
TST completed insulation upgrades at the Central Detention Facility in Washington, D.C. TST designed and manufactured 22 custom-made Removable Insulation Covers (RICs) for steam piping and fittings located throughout the facility. Applying RICs to the bare fittings, such as valves and y-strainers, will drastically reduce ambient temperatures and conserve energy and operating costs.